1 ) Track fault
2 ) Train fault
3 ) Signalling fault
4) Train stalled
5) Emergency brake fault
6 ) Door not opening on platform .
7 ) Glass panel on platform came off
8 ) water leaked in train cabin
9 ) Freon gas leaked in train cabin .
10 ) fire in tunnel
11 ) flooding in tunnel .
12) Software problem ( EWL}
13 ) the melting was caused by an electrical arcing - similar to the one which sparked a trackside fire between Marina Bay and Raffles Place stations on Oct 7, and which was caused by a build-up of debris.
14) train overshot the platform have to reverse
15 ) defective train stalled rescue train dispatched also stalled . What a joke .
16) train colliding with train
17) 'inadvertent' removal of software protection feature
18 ) Every time Mr Khaw open his big moth something serious happen
The big question is how can a certain part of the software be removed ? Was it accidently removed by human or removed by its own ? Or was it being hacked into ? So the Thales signalling software safe and secure or not ?
Why so many issues with SMRT and yet the Minister still do not want to set up an Independent Committee of Inquiry ? Why is it taking so long for the signalling software to stabalise ???